Handing Over in July 2018
Construction of two Concrete Reservoirs, each 1,500,0000 m3 Capacity, 2.2m Diameter 5-kilometer long PCCP. Two Inlet Pressure Pipelines underground from Jubail SWCC Water Transmission Lines entering Riyadh City to High Point Reservoirs & 2.2m Diameter 5 kilometer long PCCP Two outlet Gravity Pipelines underground from Reservoirs to Riyadh City Water Supply Network complete with motorized isolation valve Chambers/Washout Chambers, Gas Chlorination System equipped with Power Plant & Control System, Telemetry based SCADA System for pipelines.
The Challenge
Construction of two Concrete Reservoirs, each 1,500,0000 m3 Capacity, 2.2m Diameter 5-kilometer long PCCP. Two Inlet Pressure Pipelines underground from Jubail SWCC Water Transmission Lines entering Riyadh City to High Point Reservoirs & 2.2m Diameter 5 kilometer long PCCP Two outlet Gravity Pipelines underground from Reservoirs to Riyadh City Water Supply Network complete with motorized isolation valve Chambers/Washout Chambers, Gas Chlorination System equipped with Power Plant & Control System, Telemetry based SCADA System for pipelines.