Handing Over in February 2015
Ductile Iron Pipe (250 to 500mm diameter) network connected to 212 km long Water Transmission Line.
Construction of Six Water Pumping Stations, each station complete with one to three underground concrete Reservoirs (1,000 to 5,000 m3), Pump Room ( 500 m3/hrX 3 to 6 Nos.), Power Plant, Surge Protection, Chlorination System, many Buildings, Workshop, Guard House, Boundary Wall, Tanker Filling Point and 212 km long underground (250 to 500mm) diameter ductile iron pipeline interconnecting all six stations for transfer of water from Yadma to the areas near Najran. Voice Communication and Remote Control Operation by SCADA System between all stations.
The Challenge
Ductile Iron Pipe (250 to 500mm diameter) network connected to 212 km long Water Transmission Line.Construction of Six Water Pumping Stations, each station complete with one to three underground concrete Reservoirs (1,000 to 5,000 m3), Pump Room ( 500 m3/hrX 3 to 6 Nos.), Power Plant, Surge Protection, Chlorination System, many Buildings, Workshop, Guard House, Boundary Wall, Tanker Filling Point and 212 km long underground (250 to 500mm) diameter ductile iron pipeline interconnecting all six stations for transfer of water from Yadma to the areas near Najran. Voice Communication and Remote Control Operation by SCADA System between all stations.