Handing Over in July 2017
Construction of 75,000 m3/d RO Water Treatment Plant( Designed capacity extendable to 100,000 m3/d) comprised of many concrete water tanks( 5000 to 100,000 m3 ), many buildings, roads, Power Plant and Product Water Pumping Station( Designed Capacity 100,000 m3/d at 30 bar) with 2 km long 1000 mm diameter ductile iron Pipeline connected to existing 70km long 1000mm diameter ductile iron water transmission pipeline going to Bish.
The Challenge
Construction of 75,000 m3/d RO Water Treatment Plant( Designed capacity extendable to 100,000 m3/d) comprised of many concrete water tanks( 5000 to 100,000 m3 ), many buildings, roads, Power Plant and Product Water Pumping Station( Designed Capacity 100,000 m3/d at 30 bar) with 2 km long 1000 mm diameter ductile iron Pipeline connected to existing 70km long 1000mm diameter ductile iron water transmission pipeline going to Bish.