Handing Over in November 2014
Construction of 50,000 m3/d Dam Water Pre-Treatment Plant ( Extendable to Designed Capacity 100,000 m3/d) comprised of many process concrete water structures/tanks/ ( 5000 to 50,000 m3 ). Many buildings, roads, 5500KW Power Plant, Product Water Pumping Station(100,000 m3/hr at 55 bar) and 58.5 km long 500mm diameter Carbon Steel Water Transmission line equipped with cathodic Protection, Isolation Valve/Washout Chambers and Telemetry based SCADA System going to Shuwaiba from Helli Dam.
Construction of five shallow wells(each 20,000 m3/d) complete with pump, power plant and their interconnection with ductile iron pipes up to Raw Water Tank in the plant.
The Challenge
Construction of 50,000 m3/d Dam Water Pre-Treatment Plant ( Extendable to Designed Capacity 100,000 m3/d) comprised of many process concrete water structures/tanks/ ( 5000 to 50,000 m3 ). Many buildings, roads, 5500KW Power Plant, Product Water Pumping Station(100,000 m3/hr at 55 bar) and 58.5 km long 500mm diameter Carbon Steel Water Transmission line equipped with cathodic Protection, Isolation Valve/Washout Chambers and Telemetry based SCADA System going to Shuwaiba from Helli Dam.
Construction of five shallow wells(each 20,000 m3/d) complete with pump, power plant and their interconnection with ductile iron pipes up to Raw Water Tank in the plant.